Construction & Fortifications
Carpentry, masonry, concrete, field fortifications and engineering design.
Construction & FortificationsSign up free to download this bundleLog in
Sort by title · year
- Engineer Field Data, Chapter 7: Bridging
Chapter 7 Bridging RIVER CROSSING Operations River crossing operations may be hasty, deliberate, or crossings are always conducted in three phases: assault, bridging. retrograde. Deliberate rafting (Table 7-1), and Table
- Engineer Field Data, Chapter 8: Roads and Airfields
Table 8-1. Soil characteristics Chapter 8 Roads and Airfields 8-1
- Engineer Field Data, Chapter 9: Rigging and Vehicle Recovery
Chapter 9 Rigging and Vehicle Recovery ROPES Tables 9-1 and 9-2 give characteristics, safety factors, and breaking strength for different diameters of wire, manila, and sisal ropes. Table 9-1. Wire rope characteristics a
- Engineer Field Data: Glossary
GLOSSARY A ACE ADAM ADE ADM AHD AM AP APB APC APF approx AR armd AT ATD AVLB bde BEB BEB-SD BIFV bn °C CAB cav CBR C bt CEO CEOI CEV CFA CLAMS Acronyms and Abbreviations armed armored combat earthmover Area Denial Artill
- Engineer Field Data: Index
Abatis, 3-4, 6-6 Abutments, 1-8 Air defense weapons, 10-25 Aircraft characteristics, 2-23 Airfields Constructions, 2-25 - 2-27 Dust control, 2-24 Maintenance, 2-27 Mat repairs, 8-12 Mats, 8-10 Repairs, 8-11 - 8-16 Requir
- Engineer Field Manual, Volume II: Military Engineering, Part Two: Defensive Measures (Tentative)
WAR DEPARTMENT iENGINEER FIELD MANUAL Volume II MILITARY ENGINEERING (TENTA TI VE) PART TWO DEFENSIVE MEASURES
- Environmental Considerations (Mcrp 3-40B.2) (This Item Is Published W/ Basic Incl C2)
ATP 3-34.5 MCRP 3-40B.2 ENVIRONMENTAL CONSIDERATIONS August 2015 DISTRIBUTION RESTRICTION. Approved for public release; distribution is unlimited. *This publication supersedes FM 3-34.5/MCRP 4-11B, 16 February 2010. HEAD
- FM 5-103 Survivability
Field Manual No. 5-103 *FM 5-103 Headquarters Department of the Army Washington, DC, 10 June 1985 *This publication supersedes FM 5-15, 27 June 1972 and TB 5-15-1, 16 July 1969.
- FM 5-15 Field Fortifications (1940)
FM 5-15 s.Ct47qJ /fon- WAR DEPARTMENT ENGINEER FIELD MANUAL FIELD FORTIFICATIONS ,_ ! MHl 42opy3 .
- FM 5-15 Field Fortifications (1944)
WAR DEPARTMENT FIELD MANUAL CO P S OF ENGINEERS FIELD FORTIFICATIONS WAR DEPARTMENT : 14 FEBRUARY, 1944
- FM 5-164 Tactical Land Clearing
Field Manual No. 5-164 * FM 5-164 HEADQUARTERS DEPARTMENT OF THE ARMY Washington, D. C., 30 August 1974 CHAPI'ER Section CHAPI'ER Section CHAPTER Section APPENDIX INDEX 1. 2. 1. II. 3. 1. II. III. IV. V. 4. I. II. A. } T
- FM 5-426 Army Carpentry
- FM 5-428 Concrete and Masonry
Distribution Restriction: Approved for public release. Distribution is unlimited
- FM 5-484 Multiservice Procedures for Well-Drilling Operations (NAVFAC P-1065)
- FM 5-490 Engineer Diving Operations
- FM 5-5 Engineer Field Manual: Troops and Operations (1941)
FM 5-5 WAR DEPARTMENT ENGINEER FIELD MANUAL TROOPS AND OPERATIONS JANUARY 31, 1941
- FM 5-5 Engineer Troops (1943)
:1yt -.- .WAR DEPARTMENT ENGINEER FIELD MANUAL ENGINEER TROOPS 11 October, 1943 At
- General Engineering
ATP 3-34.40 MCTP 3-40D (MCWP 3-17.7) GENERAL ENGINEERING APRIL 2023 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. This publication supersedes ATP 3-34.40 (FM 3-34.400)/MCWP 3-17.7, dat
- Guide to Bare Base Assets (shelters)
AIR FORCE HANDBOOK 10-222, VOLUME 2 6 February 2012 BARE BASE ASSETS DEPARTMENT OF THE AIR FORCE
- Guide to Bare Base Mechanical Systems
AIR FORCE HANDBOOK 10-222, VOLUME 12 23 April 2009 GUIDE TO BARE BASE MECHANICAL SYSTEMS DEPARTMENT OF THE AIR FORCE