Construction & Fortifications
Carpentry, masonry, concrete, field fortifications and engineering design.
Construction & FortificationsSign up free to download this bundleLog in
Sort by title · year
- AFMAN 32-1125 TI 850-02 Railroad Design and Rehabilitation
TI 850-02 AIR FORCE AFMAN 32-1125(I) 1 MARCH 2000 Technical Instructions Railroad Design and Rehabilitation US Army Corps of Engineers ® Headquarters U.S. Army Corps of Engineers Engineering and Construction Division Dir
- BASE CAMPS (MCRP 3-40D.13)
ATP 3-37.10 MCRP 3-40D.13 BASE CAMPS JANUARY 2017 DISTRIBUTION: Approved for public release; distribution is unlimited. This publication supersedes ATP 3-37.10/MCRP 3-17.7N, 26 April 2013. HEADQUARTERS, DEPARTMENT OF THE
- CARPENTRY (MCRP 3-40D.3)
TM 3-34.47/MCRP 3-40D.3 CARPENTRY JULY 2022 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. This publication supersedes TM 3-34.47/MCRP 3-17.7C, dated 20 September 2013. HEADQUARTERS, DE
- Civil Engineer Camouflage, Concealment and Deception Measures
Administrative Changes to AFH 10-222, Volume 10, Civil Engineer Camouflage, Concealment, and Deception Measures OPR: AFCEC/CXX References throughout to “HQ AFCESA/CEXX” are hereby changed to “AFCEC/CXX.” Delete reference
- Civil Engineer Guide to Fighting Positions, Shelters, Obstacles, and Revetments
AIR FORCE HANDBOOK 10-222, VOLUME 14 1 August 2008 CIVIL ENGINEER GUIDE TO FIGHTING POSITIONS, SHELTERS, OBSTACLES, AND REVETMENTS DEPARTMENT OF THE AIR FORCE
- CONCRETE AND MASONRY (THIS ITEM IS PUBLISHED W/ BASIC INCL C1)
TM 3-34.44 (FM 5-428/18 June 1998) MCRP 3-40D.4 CONCRETE AND MASONRY July 2012 Publication of TM 3-34.44, 30 September 2011, supersedes FM 5-428, Concrete and Masonry, 18 June 1998. This special conversion to the TM publ
- EARTHMOVING OPERATIONS {MCRP 3-40D.9} (THIS ITEM IS PUBLISHED W/ BASIC INCL C1)
TM 3-34.62 (FM 5-434/15 June 2000)/MCRP 3-17.7I EARTHMOVING OPERATIONS June 2012 Publication of TM 3-34.62, 29 June 2012, supersedes FM 5-434, Earthmoving Operations, 15 June 2000. This special conversion to the TM publi
- EN0054 Engineer Intelligence Reconnaissance
SUBCOURSE EDITION EN0054 A ENGINEER INTELLIGENCE & RECONNAISSANCE
- EN0533 Carpentry III
SUBCOURSE EDITION EN0053 7 CARPENTRY III
- EN5151 Design Forms For A Concrete Wall
SUBCOURSE EDITION EN5151 A DESIGN FORMS FOR A CONCRETE WALL
- EN5155 Carpentry I
SUBCOURSE EDITION EN5155 A US ARMY ENGINEER CENTER AND SCHOOL CARPENTRY I
- EN5156 Carpentry II
SUBCOURSE EDITION EN5156 B CARPENTRY II
- EN5462 Geology
SUBCOURSE EDITION EN5462 A US ARMY ENGINEER CENTER AND SCHOOL GEOLOGY
- Engineer Field Data, Chapter 1: Combat Operations
Chapter 1 Combat operations COMBAT ORDERS COMBAT PREPARATIONS Combat orders are written or oral communications used to transmit information pertaining to combat operations. Warning Order A warning order gives advance not
- Engineer Field Data, Chapter 10: Miscellaneous Field Data
Chapter 10 Miscellaneous Field Data SPECIFIC WEIGHTS AND GRAVITIES Table 10-1. Specific weights and gravities 10-1
- Engineer Field Data, Chapter 2: Mobility
Chapter 2 Mobility THREAT DEFENSE The Threat defense may be hasty or deliberate, with emphasis on mine employment All obstacles are covered by director indirect fires. Hasty Defense The main obstacle employed is the Thre
- Engineer Field Data, Chapter 3: Countermobility
CHAPTER 3 Countermobility THREAT OFFENSE Crossing Capabilities and Characteristics Table 3-1. Threat equipment obstacle crossing capabilities and characteristics 3-1
- Engineer Field Data, Chapter 4: Survivability
WEAPONS FIGHTING POSITIONS CHAPTER 4 Survivability Positions may be hasty or deliberate depending on time and material availability Positions may be dug by hand or mechanically (with JD410). Table 4-1 shows required thic
- Engineer Field Data, Chapter 5: Reconnaissance
Figure 5-1. Route classification formula Figure 5-1. Route classification formula Chapter 5 Reconnaissance ROUTE RECONNAISSANCE Distances will be expressed in metric dimensions on at reports Critical Features The followi
- Engineer Field Data, Chapter 6: Demolitions
Chapter 6 Demolitions SAFETY The minimum safe distances for personnel in the open when detonating explosives are given in Table 6-1. Table 6-1. Explosives minimum safe distances Explosives may be prematurely detonated by